# Wed Jul 8 14:26:40 EDT 1998 # fpc_ht.dev QE deviations # Energy: keV # QE: linearly interpolated Fitted QE # QE_fpc_*: Measured QE # QE_err_fpc_*: error on measured QE # dev = (Fit/Meas) - 1.0 # note large deviations near C, N, and O edges. Energy QE QE_fpc_ht QE_err_fpc_ht dev N N N N N 0.183 0.18539 0.19324 0.00071 -0.04064 0.277 0.53649 0.53072 0.00137 0.01087 0.524 0.17238 0.18166 0.00065 -0.05106 0.705 0.30360 0.32766 0.00105 -0.07345 0.705 0.30360 0.30991 0.00100 -0.02036 0.852 0.48683 0.48755 0.00165 -0.00149 0.929 0.56461 0.56805 0.00167 -0.00605 1.254 0.77770 0.78033 0.00768 -0.00338 1.486 0.84632 0.84329 0.00353 0.00360 1.486 0.84632 0.84251 0.01240 0.00453 4.51 0.94176 0.94936 0.00853 -0.00801 4.51 0.94176 0.92708 0.01175 0.01583 5.41 0.83444 0.80703 0.00825 0.03396 6.4 0.68063 0.69902 0.00888 -0.02631 6.4 0.68063 0.67276 0.04272 0.01171 8.62 0.39164 0.34616 0.00618 0.13139